Abbotsford Bridge Traffic Conditions Altered

Wentworth Shire

Transport for New South Wales wishes to advise motorists of changed traffic conditions on Abbotsford Bridge at Curlwaa this month due to maintenance works.

The works will commence on Tuesday 3 June 2025 and will be carried out on weekdays between 7am and 5pm. Maintenance is expected to take place between Tuesday 3 and Sunday 8 June, and again from Monday 16 to Sunday 22 June 2025, weather permitting.

During this period, motorists may experience delays of up to 10 minutes when crossing the bridge.

Drivers are advised to adjust their speed to suit conditions, follow all signs and directions from traffic control, and allow extra travel time.

Transport for New South Wales thanks motorists for their patience.

For the latest traffic updates, please download the Live Traffic NSW app, visit livetraffic.com, or call 132 701.

/Public Release. This material from the originating organization/author(s) might be of the point-in-time nature, and edited for clarity, style and length. Mirage.News does not take institutional positions or sides, and all views, positions, and conclusions expressed herein are solely those of the author(s).View in full here.