Deck replacement for Middle Brighton Baths

We are upgrading the rear deck at Middle Brighton Baths as it has reached the end of its useable life and requires replacing.

These improvements will ensure that the deck at the Baths can continue to be used for dining and recreational purposes now and well into the future.

Council has consulted with current tenants of Middle Brighton Baths on timing to ensure that the essential upgrades are completed during the off-peak period.

These works will be completed in stages for different sections of the deck area and commence on Monday 16 May. We anticipate that all works will be completed with eight weeks, weather permitting.

Access to the building will be maintained where possible however, there will be small periods of time where access to and from the baths, steam room and outside the gym area will not be possible.

Please refer to the signage in place when visiting the precinct.

We apologise for the inconvenience and appreciate your understanding.

/Public Release. This material from the originating organization/author(s) might be of the point-in-time nature, and edited for clarity, style and length. Mirage.News does not take institutional positions or sides, and all views, positions, and conclusions expressed herein are solely those of the author(s).View in full here.