Geotechnical Investigations - Molong

Media (13).jpg

Geotechnical investigations will take place on Castle Street and Banjo Paterson Way, Molong on Monday, 1 December 2025, between 8:00am and 5:30pm (weather permitting).

The work involves drilling boreholes for soil sampling as part of planning for future road upgrades.

What to expect:

  • Traffic control in place with stop/slow setup
  • Half-road closure at work sites
  • Speed reduced to 40km/h
  • Minimal impact on pedestrians and cyclists

Please drive carefully and follow directions from traffic controllers. Thank you for your patience as we work to improve local roads.

/Public Release. This material from the originating organization/author(s) might be of the point-in-time nature, and edited for clarity, style and length. Mirage.News does not take institutional positions or sides, and all views, positions, and conclusions expressed herein are solely those of the author(s).View in full here.