Maintenance works at Blacksmith Beach all-access ramp

Lake Macquarie City Council

The new Blacksmiths Beach accessible paths (1).jpg

Council is conducting works to remove sand from the Blacksmiths Beach all-access ramp.

These works are expected to start on Tuesday 19 December and be complete by Sunday 24 December.

During this time, access to the beach can be made via an adjacent ramp.

We apologise for the inconvenience.

/Public Release. This material from the originating organization/author(s) might be of the point-in-time nature, and edited for clarity, style and length. Mirage.News does not take institutional positions or sides, and all views, positions, and conclusions expressed herein are solely those of the author(s).View in full here.