Wentworth Shire
Changed traffic conditions – George Chaffey Bridge maintenance
Transport for NSW advises motorists of changed traffic conditions for essential maintenance work on the NSW approach bridge to the George Chaffey Bridge.

Routine maintenance will be carried out to provide a safer road for motorists. To minimise impact on the community, work is being carried out at night between 8pm and 6am, between Monday 23 and Friday 27 March, weather permitting.
Traffic control will be in place and includes lane closures and a reduced speed limit of 40 km/h. There will be temporary bridge closures with short delays at various times during each shift. Motorists are advised to drive to the conditions, follow the direction of signs and traffic control and allow an extra 20 minutes travel time.
/Public Release. This material from the originating organization/author(s) might be of the point-in-time nature, and edited for clarity, style and length. Mirage.News does not take institutional positions or sides, and all views, positions, and conclusions expressed herein are solely those of the author(s).View in full here.