The Renewable Energy (Electricity) Regulations 2011 were recently amended to expand eligibility for solar PV systems under the Small-scale Renewable Energy Scheme (SRES) from 100 kW to 1 MW.
These changes apply to eligible mid-scale solar installed from today, 1 October 2026.
Applications are expected to open in mid to late November 2026. Eligible systems installed on or after 1 October 2026 will be able to apply once applications open.
/Public Release. This material from the originating organization/author(s) might be of the point-in-time nature, and edited for clarity, style and length. Mirage.News does not take institutional positions or sides, and all views, positions, and conclusions expressed herein are solely those of the author(s).View in full here.