Construction of the multi-million-dollar Riverina Intermodal Freight and Logistics (RiFL) Hub at Bomen in Wagga Wagga has marked another milestone, with more than one million individual pavers laid for the terminal base beside the new master rail siding.
These works form part of the $14.4 million second stage of the project, which includes construction of rail and intermodal terminal infrastructure required to load and unload freight on the main southern rail network between Melbourne and Sydney.
/Public Release. This material from the originating organization/author(s) might be of the point-in-time nature, and edited for clarity, style and length. Mirage.News does not take institutional positions or sides, and all views, positions, and conclusions expressed herein are solely those of the author(s).View in full here.