
Our team has temporarily closed the pedestrian bridge that crosses the duck pond at Pioneer Beach Estate, Woonona.
Parts of the structure had become unsafe requiring maintenance and repairs. This will include the installation of marine plywood with textured paint to reduce the risk of slip and trip hazards.
It will take one to two weeks to finalise the designs and then we can give residents and stakeholders a timeframe for reopening.
In the interim, walkers are asked to carefully skirt the lagoon on the northern side. Alternatively, there is footpath access from John Cawley Crescent to the foreshore.
/Public Release. This material from the originating organization/author(s) might be of the point-in-time nature, and edited for clarity, style and length. Mirage.News does not take institutional positions or sides, and all views, positions, and conclusions expressed herein are solely those of the author(s).View in full here.