Post-2025 Market Design Issues Paper

This submission provides background information and insight from projects funded by the ARENA as relevant to the ESBs 5 key challenges: Driving innovation to benefit the consumer; Investment signals to ensure reliability; Integration of DER into the electricity market; System security services and resilience; Integration of variable renewable energy into the power system.

ARENA submission on the Post-2025 Market Design Issues Paper (PDF 249KB)

/Public Release. This material from the originating organization/author(s) might be of the point-in-time nature, and edited for clarity, style and length. Mirage.News does not take institutional positions or sides, and all views, positions, and conclusions expressed herein are solely those of the author(s).View in full here.