Wide Load Restricted on Flinders Hwy at Walkers Creek Bridge

National Road Transport Association

From 6am – 6pm Tuesday 7 March 2023 to Sunday 19 March 2023 (weather permitting), temporary width restrictions will be in place at Walkers Creek Bridge located 69 kilometres along the Flinders Highway (Hughenden – Richmond), while works are completed to replace the bridge deck wearing surfaces.

Vehicles with a ground contact width or load width exceeding 3m will be restricted during the construction period however travel between 6pm and 6am is permitted.

Vehicles with loads exceeding 3m wide

  • Will only be permitted at daylight hours between 6am and 6pm with prior arrangement
  • Must contact Robin Van Der Ploeg 24 hours before arrival at site on 0437 304 081

Failure to comply may result in delays to your journey.

It is your responsibility to make sure you're using up-to-date information when you assess the suitability of your route.

You must check the Conditions of Operation Database before you start your journey.

Visit the QLDTraffic website, download the app or call 13 19 40 to report an incident or get real-time traffic reports.

/Public Release. This material from the originating organization/author(s) might be of the point-in-time nature, and edited for clarity, style and length. Mirage.News does not take institutional positions or sides, and all views, positions, and conclusions expressed herein are solely those of the author(s).View in full here.