Work commences at Haven Amphitheatre, Castlecrag

Willoughby City

The Haven.jpg

Work has commenced on implementing the Landscape Plan adopted by Council in April 2021.

The lower terrace is being stabilized with sandstone edging and the connecting steps are being re-set. The upper terraces will also be stabilised and uneven sections of stonework replaced to improve access and safety. This will provide improved opportunities to hold informal performances or events in this special bushland setting.

The landscape works are scheduled to be completed before the Castlecrag Centenary in November 2021.

/Public Release. This material from the originating organization/author(s) might be of the point-in-time nature, and edited for clarity, style and length. Mirage.News does not take institutional positions or sides, and all views, positions, and conclusions expressed herein are solely those of the author(s).View in full here.