Changed traffic conditions on Stockton Bridge

National Road Transport Association

Please be advised of changed traffic conditions on Stockton Bridge at Stockton, from Sunday 7 August. Work will be carried out between 7pm and 5am from Sunday to Thursday, with work expected to be completed by late September.

During this time, traffic will be diverted to one side of the bridge with a single lane of traffic operating in each direction.

Loads over 4.00 meters wide will need to call the project manager to arrange traffic control through the work zone. Contact Transport for NSW project manager, Paul Issa on 02 4983 5901 or 0403 098 140.

For the latest traffic information, visit www.livetraffic.com, download the Live Traffic NSW app or call 132 701.

Thank you for your patience during this important work.

/Public Release. This material from the originating organization/author(s) might be of the point-in-time nature, and edited for clarity, style and length. Mirage.News does not take institutional positions or sides, and all views, positions, and conclusions expressed herein are solely those of the author(s).View in full here.