Energy Breakthrough Traffic Alterations

Energy Breakthrough page 8 .jpg

To enable the safe delivery of Energy Breakthrough, road closures will be in place between Monday 11 to Friday 29 November, 2025.

EB road closure map JPEG.jpg

Please note in addition:

  • Park Road from Holyrood to Gladstone streets allows resident access at the Gladstone Street (Golf Club end)
  • Holyrood Street resident access is from the Burns Street end
/Public Release. This material from the originating organization/author(s) might be of the point-in-time nature, and edited for clarity, style and length. Mirage.News does not take institutional positions or sides, and all views, positions, and conclusions expressed herein are solely those of the author(s).View in full here.