Fast Tracking Maniry Graphite Project

BlackEarth Minerals (ASX:BEM)

Fast Tracking the Maniry Graphite Project in Southern Madagascar

BlackEarth Minerals NL (ASX:BEM) ("BlackEarth", the "Company") is pleased to release a presentation on the Maniry Graphite Project in Southern Madagascar, which has been successfully fast tracked to progressing the Bankable Feasibility Study (BFS) Stage, in under 2 years, for a total cost of less than $6m, including full overheads.

It should be noted that this is a non-deal investor presentation and roadshow.

View Presentation:

https://www.asx.com.au/asxpdf/20200117/pdf/44dbbg9d6034qc.pdf

Maniry Project Highlights include:

• The Company has successfully fast tracked its flagship Maniry graphite project in Southern Madagascar, to progressing the Bankable Feasibility Study (BFS) Stage, in under 2 years, for a total cost of less than $6m (including full overheads).

• Graphite from the Maniry Project meets specifications consistent with those required by:

- The expandable graphite market (400 cm3/g achieved industry standard of 250 cm3/g)

- The refractory industry (very low content of deleterious material)

- Lithium-ion anode material manufacturers (Initial test results achieved 99.97% purity)

• Following positive initial results, offtake discussions and ongoing testing on bulk samples, which are currently underway with Tier 1 refractory, expandable graphite and battery anode producers in China and globally.

• Excellent financial return with a Project Life of 10 years, NPV

/Public Release. This material from the originating organization/author(s) might be of the point-in-time nature, and edited for clarity, style and length. Mirage.News does not take institutional positions or sides, and all views, positions, and conclusions expressed herein are solely those of the author(s).