It's back in time for summer! The Wollongong Botanic Garden's Kawasaki Bridge has reopened to the public.
Key points:
- The Kawasaki Bridge has reopened to visitors of the Wollongong Botanic Garden.
- The Garden's much-loved attraction has been reconstructed from hardwoods and the first phase of an upgrade to our Japanese Garden has been completed.
- The project has wrapped up in time for the Garden's busy summer months.
After a five-month removal, repair, reinstallation and replanting project, the Wollongong Botanic Garden's much-loved Kawasaki Bridge has reopened to the public.
The popular bridge was craned from its spot in the Garden in June to be taken off-site for essential repair works. It was returned to its home near the Rose Garden in September but has remained closed to allow for in-situ detailing of the bridge and the first stage of an upgrade to the Japanese themed gardens in its vicinity to be completed.
"I know this bridge holds a special place in so many people's hearts,'' Lord Mayor of Wollongong Councillor Tania Brown said.
"It's an attraction within the Garden that, with its vibrant red paint, is so easily seen from Murphy's Avenue. The bridge has long been a firm favourite with photographers looking to capture the bridge's arch reflected in the waters beneath it.
"I'm delighted to see it back in place and look forward to seeing many people enjoy it for years to come.''
The traditional Japanese bridge was presented to the City of Wollongong as a gift from the City of Kawasaki in 1993 to mark the fifth anniversary of our Sister City Relationship.
It was showing signs of its age, and some of the timber had deteriorated in the Australian climate in the 21 years since it was last repaired in 2005. It was taken off-site for essential repairs and to minimise disruption to the Gardens.
The updated bridge has been reconstructed using durable hardwoods, which are suited to the local climate, and it has been painted to replicate its original vivid red. The bridge post heads were retained with their distinctive ornamental shapes, which are key features of the bridge.
Wollongong Botanic Garden acting Curator Rob Monaghan said Garden staff were pleased to see the bridge back and have enjoyed the planning process and installation of new plantings around the site.
"With traditionally themed vertical log retaining walls built by the garden staff, fresh soil and favourable current growing conditions the new plantings should thrive," Mr Monaghan said.
"The bridge itself and the new plantings around it are looking really good. In the re-establishment of the Japanese Garden we've focused on planting the types of things that you'd expect to see such as the colourful Azalea 'Rose King', Buxus or Japanese box, and Abelia hedges.''
Other plant species to watch out for include a newly planted flowering plum Prunus x blireiana and flowering cherry Prunus 'Kanzan'.
The Wollongong Botanic Garden is open from 7am to 6pm weekdays and from 7am to 6.45pm on weekends and public holidays until the end of daylight saving time on 4 April 2027. The Garden is only closed on Christmas Day and Good Friday.