Lane reductions on Burlington Canal Lift Bridge

From: Public Services and Procurement Canada

Media advisory

For immediate release

Hamilton, Ontario, January 14, 2019 — Public Services and Procurement Canada (PSPC) wishes to advise motorists that one lane in each direction on the Burlington Canal Lift Bridge will be closed for repair work during the following period:

  • Tuesday, January 15, from 9 am to 3 pm

During this period, one lane will remain open in both directions. There will be no lane reductions during peak times in order to minimize disruption.

The bridge will remain open to cyclists and pedestrians during the lane reductions.

The schedule may change depending on weather conditions.

PSPC encourages users to exercise caution when travelling on the bridge and thanks them for their patience.

/Public Release. This material from the originating organization/author(s) might be of the point-in-time nature, and edited for clarity, style and length. Mirage.News does not take institutional positions or sides, and all views, positions, and conclusions expressed herein are solely those of the author(s).View in full here.