
Hughesdale families are getting an exciting new playground at Argyle Reserve.
The upgrade includes new play equipment, accessible paths, fitness stations, a picnic shelter and new plants and landscaping.
Construction runs from February to May 2026.
This project is supported by the Victorian Government.
What's included in the new playground
Designed with community feedback, the new playspace features:
- timber play unit
- 3‑bay swing set with a nest swing
- inclusive spinner for shared play
- scramble net and log climbing unit
- dedicated obstacle course designed for older children
- fitness station and table tennis table
- new accessible pathways, landscaping, garden beds, turf and soft‑fall areas
new picnic shelter and bench seats.
Final concept design
Click to expand the image below or download a PDF of the final concept design(PDF, 3MB) .
When it's happening
Construction works: February – May 2026.
What to expect during works
During the construction period:
- The construction areas will be fenced for safety.
- Around 14 parking bays at the reserve will be temporarily unavailable.
- Deliveries will enter via Kinrade Street, which may cause short delays near the reserve driveway and parking bays.
Thank you for your patience during the works. We look forward to opening a new playspace for local families to enjoy later this year!
/Public Release. This material from the originating organization/author(s) might be of the point-in-time nature, and edited for clarity, style and length. Mirage.News does not take institutional positions or sides, and all views, positions, and conclusions expressed herein are solely those of the author(s).View in full here.
