Q2 Metals Corp
Highlights:
- Three (3) drill holes from the 2025 drill program with strong analytical results are reported herein:
- CS25-036: nine (9) separate intervals, the widest being 272.5 m at 1.61% Li2O.
- CS25-038: 17 separate intervals, the widest being 66.5 m at 1.55% Li2O and 58.9 m at 1.09% Li2O.
- CS25-039: 12 separate intervals, including:
- 108.5 m at 1.62% Li2O,
- 71.0 m at 1.84% Li2O,
- 77.7 m at 1.48% Li2O, and
- 107.4 m at 1.87% Li2O
- CS25-039: 12 separate intervals, including:
- Three (3) drill rigs continue to operate on the Cisco Project, with a fourth scheduled to start at the end of October 2025.
- The upcoming drilling programs will be primarily focused on infill-scale drilling within the main mineralized zone, supporting the Company's efforts to deliver an initial inferred Mineral Resource Estimate in the first half of 2026.
VANCOUVER, British Columbia, Sept. 29, 2025 (GLOBE NEWSWIRE) -- Q2 Metals Corp. (TSX.V: QTWO | OTCQB: QUEXF | FSE: 458) ("Q2" or the "Company") is pleased to report assay results from the ongoing 2025 drill program (the "2025 Drill Program") at the Company's Cisco Lithium Project (the "Project" or the "Cisco Project"), located within the greater Nemaska traditional territory of the Eeyou Istchee James Bay region of Quebec, Canada.
"Hole 36, with its 272.5 metres of continuous spodumene pegmatite grading 1.61% Li2
/Public Release. This material from the originating organization/author(s) might be of the point-in-time nature, and edited for clarity, style and length. Mirage.News does not take institutional positions or sides, and all views, positions, and conclusions expressed herein are solely those of the author(s).