We will be resurfacing Springfield Road between Southey Street and Surrey Road, as part of Council's annual road maintenance program.
When will works take place?
The works will be delivered in stages with patching works scheduled to start on Monday 18 May 2026 and are expected to take up to 3 days. Working hours will generally be 9.30 am to 3.00 pm, Monday to Friday.
Please note that the dates above may change if the weather conditions are poor. Any changes will be communicated in advance. Electronic signs will be on display to notify road users.
What will the works involve?
Removing sections of the existing road surface where needed
Repairing damaged areas of the road
Laying a new asphalt surface
Traffic management during works, including road closures or detours if required
Repainting line markings after works are complete (usually at night).
Parking restrictions
Parking will not be permitted on the section of Springfield Road being resurfaced between 7.30am and 5.00pm.
Traffic and access changes
- Springfield Road will be closed to through traffic during the hours of 9.30 am to 3.00 pm, between Southey Street and Surrey Road.
- Local access will be maintained but short delays are expected.
- Traffic controllers will be onsite to assist and minimise wait times.
- Access to North Blackburn Shopping Centre will be via Willams Road.
- If you need to use your vehicle during the day, please park outside the active work area.
Public transport and bin collection
- The bus service along Springfield Road will continue to operate normally.
- There may be bus stops temporarily unavailable during the works. Please follow directions provided by the on-site traffic controller to the nearest alternative bus stop.
- Bin collection will take place on your usual day, although collection times may vary.
- If any changes are required, residents will be notified in advance.