Temporary Closure - Fawcett Street and Fawcett Park 5 December

Ballina Shire Council will temporarily close sections of Fawcett Street and Fawcett Park on Thursday 7 December 2023, to reinstall steel sculptures within the park.

The public artwork, which are the steel sculptures sitting atop poles in Fawcett Park, have been repaired.

A crane will be used to install the sculptures, which will require the temporary closure of sections of Fawcett Street and Fawcett Park, including the playground.

The crane will be operating from 7am, and it is expected that work will be completed by 10.30am.

Access to sections of Fawcett Park, including the playground, will be restricted at times.

Traffic will be detoured via Cherry Street and Moon Street, with vehicle access maintained for residents and businesses, including deliveries where possible.

The riverfront pathway will also be closed at various locations as the sculptures are moved into place.

Pedestrian access on the footpath adjacent to businesses will not be obstructed. However, traffic controllers will help pedestrians if required.

For road closure updates visit livetraffic.com.au

/Public Release. This material from the originating organization/author(s) might be of the point-in-time nature, and edited for clarity, style and length. Mirage.News does not take institutional positions or sides, and all views, positions, and conclusions expressed herein are solely those of the author(s).View in full here.