Temporary closure of all abilities pathway in Cairns Botanic Gardens

The all abilities pathway (inside Flecker Botanic Gardens) will be closed for landscaping works.

The closure will commence Monday 9 December 2019 and works are anticipated to be finalised by Friday 20 December 2019.

A scheduled hard landscaping project will be carried out and this path needs to be isolated from use to ensure appropriate exclusion zones are implemented.

The pathway is a thoroughfare to the Jade Vine arbour and Council will ensure that the vine can still be viewed at a close proximity from an alternate pathway.

/Public Release. This material from the originating organization/author(s) might be of the point-in-time nature, and edited for clarity, style and length. Mirage.News does not take institutional positions or sides, and all views, positions, and conclusions expressed herein are solely those of the author(s).View in full here.