Dartford tunnel sees its longest ever load

Image showing the 41 metre-long footbridge about to enter Dartford Crossing's East tunnel

The footbridge, destined for Southend in Essex, was the length of nearly five double decker buses. It was moved in a carefully planned operation between Highways England, Essex Police and Dartford Crossing operators Connect Plus Services in a way that meant traffic at the crossing only needed to be held for three minutes.

Highways England spokesperson Tommy Whittingham said:

The Dartford Crossing is the only road link across the River Thames to the east of London and is a vital part of the nation's road network. It is used to make more than 185,000 journeys every day and we work hard to make sure we deal with abnormal and dangerous loads as smoothly as possible. Even though this was the longest load that we have seen at the Dartford Crossing, close working between us, the police and our colleagues at Connect Plus ensured that we could safely escort this footbridge through the tunnel with minimum disruption for other drivers.

The Dartford Crossing crosses the River Thames and is made up of two tunnels carrying traffic northbound from Kent into Essex and the Queen Elizabeth II bridge taking traffic south. Linking the two ends of the M25 together, the Crossing and its approach roads are classified as the A282 so that vehicles prohibited from motorways can use it.

The West tunnel opened in 1963, with the East tunnel following in 1980. The QE II bridge opened in 1991.

The strategic road network is often used for transporting oversized cargoes.

At 41 metres, the footbridge is the longest load ever to go through the Dartford tunnel, but also last month a 232-tonne electrical transformer the size of a house was taken over the Dartford Bridge on a specialist vehicle 58 metres long. The journey from Tilbury docks to Iver Heath in Buckinghamshire took 41 hours over two days travelling at 20 miles per hour.

And, in 2015, a 28-metre-long fuselage for a VC10 jet airliner was transported by lorry from Leicestershire to the RAF Museum in Cosford, Shropshire, via the M69, M6 and the M54. The journey took six hours and involved some tricky manoeuvring, including going under several low bridges.

General enquiries

Members of the public should contact the Highways England customer contact centre on 0300 123 5000.

Media enquiries

Journalists should contact the Highways England press office on 0844 693 1448 and use the menu to speak to the most appropriate press officer.

/Public Release. This material from the originating organization/author(s) might be of the point-in-time nature, and edited for clarity, style and length. Mirage.News does not take institutional positions or sides, and all views, positions, and conclusions expressed herein are solely those of the author(s).View in full here.