Drainage plumbing work inspections - plumbers notification requirements

WA Department of Mines, Industry Regulation and Safety

This article is to advise licensed plumbing contractors (LPCs) of changes regarding the available methods to notify the Plumbers Licensing Board (Board) that drainage plumbing is ready to be inspected.

LPCs responsible for drainage plumbing work, must give the Board notice of the time at which the drainage plumbing will be ready for inspection. The notice must be before the time and in the manner nominated by the Board in accordance with regulation 70(1) of the Plumbers Licensing and Plumbing Standards Regulations 2000.

On Tuesday 18 October 2022 the methods available to notify the Board were updated in the Government Gazette on page 4938 of Gazette No. 150.

Time for giving notice (r.70 notice)

The time for lodging a notice, now known as an r.70 notice, is unchanged - an r.70 notice is to be given to the Board by no later than 4.30pm on the Wednesday of the week, following completion of the relevant drainage plumbing work.

Means for giving r.70 notice

eNotice

Where the corresponding notice of intention to commence plumbing work has been given to the Board via eNotice, the r.70 notice must be given on eNotice.

Other means - paper notice of intention

Where the corresponding notice of intention has been given to the Board other than via eNotice (paper-based), an r.70 notice is to be given -

  1. verbally by telephoning 08 6251 1377 between 8:30am and 4:30pm on a business day;
  2. in writing by SMS to 0417 209 818; or
/Public Release. This material from the originating organization/author(s) might be of the point-in-time nature, and edited for clarity, style and length. Mirage.News does not take institutional positions or sides, and all views, positions, and conclusions expressed herein are solely those of the author(s).View in full here.