Flood Recovery Work Underway at Maguires Creek Bridge on Eltham Road

Maguires Creek Bridge Eltham Road image.png

Ballina Shire Council is continuing permanent repairs to roads and infrastructure damaged during the 2022 floods as part of its Essential Public Asset Reconstruction (EPAR) Program.

Works to repair and strengthen the embankment at Maguires Creek Bridge on Eltham Road will commence on Monday 30 November 2026 and are expected to take eight weeks, weather permitting.

What motorists can expect:

  • Temporary lane closures and short delays at Maguires Creek Bridge.
  • Eltham Road will remain open in both directions, with traffic controllers managing vehicles through the work area.
  • Motorists are encouraged to allow extra travel time, exercise caution and follow traffic control directions.

Council thanks motorists for their patience and understanding during these essential works.

The EPAR Program is jointly funded by the Australian and NSW Governments under the Disaster Recovery Funding Arrangements.

For more information, visit ballina.nsw.gov.au/EPAR

For real-time traffic updates, visit livetraffic.com.au

/Public Release. This material from the originating organization/author(s) might be of the point-in-time nature, and edited for clarity, style and length. Mirage.News does not take institutional positions or sides, and all views, positions, and conclusions expressed herein are solely those of the author(s).View in full here.