Sewer Inspections: Bradley, Cemetery, Maud & Syd Rd

Goulburn Mulwaree Council

GMC Logo.jpg

Goulburn Mulwaree Council advises that essential sewer CCTV inspection night works will be undertaken by its contractor, Pipeline Management Australia (PMA), in parts of Goulburn from Monday 22 June 2026 to Friday 26 June 2026.

The works will take place in and around Bradley Street, Cemetery Street, Maud Street and Sydney Road between 7pm and 5am each night.

These inspections form part of Council's ongoing sewer network maintenance program and are important for assessing the condition of underground infrastructure and planning future maintenance works.

As the works involve only CCTV inspections of existing sewer infrastructure, noise levels are expected to be minimal.

Residents and businesses in affected areas will receive notification letters before works commence in their street.

While every effort will be made to minimise disruption, some temporary impacts may occur during the works, including:

• Short-term traffic control measures

• Temporary Lane closures or detours, where required

• Temporary access adjustments near work zones

Traffic management will be in place throughout the works to ensure the safety of pedestrians, motorists and workers.

Council appreciates the patience and cooperation of the community while these necessary works are carried out.

/Public Release. This material from the originating organization/author(s) might be of the point-in-time nature, and edited for clarity, style and length. Mirage.News does not take institutional positions or sides, and all views, positions, and conclusions expressed herein are solely those of the author(s).View in full here.