The Coordinator of Energy has published the 2026 Determination of the Benchmark Technologies.
The Coordinator of Energy (Coordinator) has conducted a review of the Benchmark Technologies, which are used to determine the Peak and Flexible Benchmark Reserve Capacity Prices (BRCPs).
The Coordinator must determine the Benchmark Capacity Providers within six months of a revised Electricity Storage Resource Duration Requirement (ESRDR) being published in AEMO's Electricity Statement of Opportunities (ESOO).
AEMO's 2026 ESOO was published on 23 June 2026 and included an ESRDR of 7 hours, an increase from the previous ESRDR of 6 hours.
On 20 November 2026, the Coordinator published the 2026 Determination of the Benchmark Technologies.
In summary, the Coordinator has determined that:
The Benchmark Peak Technology and Benchmark Flexible Technology will be E-Class Simple Cycle Gas Turbines with:
- a two-unit dual-fuel configuration;
- two electrical connections to the transmission network, limiting the maximum single contingency to approx. 180 MW;
- a dual-fuel operating model, certified on liquid fuel in the Reserve Capacity Mechanism but with a preference to run on gas fuel when practical;
- 42 hours of onsite liquid fuel storage;
- connection to the Dampier to Bunbury Natural Gas Pipeline (DBNGP);
- DBNGP capacity reservation equal to 25% of the Facility's daily gas consumption when operating at full capacity; and
- an unconstrained location near a 330kV node on the Clean Energy Link North.
Benchmark Reserve Capacity Prices will be determined on a gross Cost of New Entry basis.
The Determination can be found by clicking the link below.
2026 Review of the Benchmark Technologies - Coordinator of Energy Determination