Commission Renews Ontario Power Generation's Darlington Waste Management Facility Operating Licence for 10 Years

Canadian Nuclear Safety Commission

Today, the Canadian Nuclear Safety Commission (CNSC) announced the Commission's decision to renew the waste facility operating licence held by Ontario Power Generation (OPG) for its Darlington Waste Management Facility (DWMF), located on the site of the Darlington Nuclear Generating Station (DNGS) in the Municipality of Clarington, Ontario. The DWMF is located on the traditional territory of the Wendat, Anishinabek Nation, and the territory covered by the Williams Treaties with the Michi Saagiig and Chippewa Nations.

The Commission renewed the licence for a period of 10 years. OPG is authorized to operate the DWMF to process and store dry storage containers holding used nuclear fuel from the DNGS, as well as intermediate-level radioactive waste generated from the ongoing refurbishment of the DNGS.

This decision follows a public hearing held virtually on January 26, 2023. As part of the licence renewal, the Commission renews the authorization for the construction and operation of 2 additional structures for the storage of used fuel, subject to specific licence conditions. The Commission also authorizes an increase in the combined total capacity of the additional used fuel dry storage structures, from 1,000 to 1,200 dry storage containers. The renewed licence reflects the Commission's acceptance of the change in terminology for these structures, from "used fuel dry storage buildings" to "used fuel dry storage structures".

The renewed licence also reflects the Commission's decision not to accept OPG's request to change the name of the facility to Nuclear Sustainability Services - Darlington. In keeping with the CNSC's regulatory framework, the name in the licence will remain Darlington Waste Management Facility.

In making its decision, the Commission considered submissions from OPG, CNSC staff and 30 intervenors. After reviewing all submissions, the Commission concluded that OPG is qualified to carry on the activities that the renewed licence will authorize. It also concluded that OPG will continue to make adequate provision for the protection of the environment, and the health and safety of persons.

The CNSC made participant funding available through its Participant Funding Program, and invited interventions from Indigenous Nations and communities, members of the public and stakeholders. A funding review committee, independent of the CNSC, reviewed the funding applications received and made recommendations on the allocation of funds. Based on the committee's recommendations, the CNSC awarded up to approximately $70,000 to 5 applicants.

/Public Release. This material from the originating organization/author(s) might be of the point-in-time nature, and edited for clarity, style and length. Mirage.News does not take institutional positions or sides, and all views, positions, and conclusions expressed herein are solely those of the author(s).View in full here.