
Underdale Lane, between Railway Road/Bay Drive and Faraday Lane, will be subject to a full road closure for a period of three (3) weeks from 23 November 2026 to 14 December 2026.
The temporary road closure is necessary to enable the delivery of public domain improvements, which include a new raised pedestrian crossing on Underdale Lane near Railway Road/Bay Drive and a new footpath on the eastern side of Railway Road between Constitution Road and Underdale Lane. The works are being carried out by Buildcorp as part of the development at 1–20 Railway Road, as part of conditions set by the NSW Land and Environment Court.
During the closure period, detours will be in place to guide motorists, pedestrians and other road users around the construction zone. The detour arrangements will be informed by the traffic management measures specified within a Traffic Guidance Scheme prepared by a SafeWork NSW-accredited designer, ensuring the safe and efficient movement of road users around the construction zone. Key measures that will be implemented include:
- Traffic controllers to assist with pedestrian movements across Railway Road/Bay Drive and Bank Street bridge;
- A temporary 30km/h road work speed limit; and
- Concrete barriers and construction fencing on Underdale Lane to provide pedestrian protection.